★ BBB A+ Rated ★Online since 1999Serving 40+ Industries(888) WAX-MELTERS | (888) 929-6358Pay an InvoiceEN ES
WaxMelters logoWAXMELTERSThermal Process Equipment 0Cart
Buy NowCart 0Checkout
Home / Shop by Industry / Composite, Resin & Polymer Processing

Industry Solutions

Composites, Resins and Polymers Equipment

Waterless PRIMO USA stainless steel melting tanks, heated transfer and heated filling for Composites, Resins and Polymers production. Built in the USA, BBB A+ rated, with direct factory support.

  • BBB A+ rated
  • Built in Ronkonkoma, NY
  • 1-year electrical, 3-year metal parts warranty
  • Trusted by NASA and Fortune 500s

Typical Starting Point

  • Melt: PRIMO from $1,395, usually ships within 3 to 5 days (25 to 250 lb)
  • Hold: Thermal Conditioning from $1,645
  • Move: EZ-T heated transfer from $2,995

Heating options usually ship within 7 days.

Trusted by

Blue Origin logoNASA logoFender logoYamaha logoJim Beam logoMaker's Mark logo3M logoDuPont logoLockheed Martin logoGeneral Electric logoHoneywell logoSiemens logo

Reviews

  • ★★★★★We purchased our PRIMO Melter and EZ system from Melting & Filling Equipment for our ointment and... Rowena, Herbs From Wales, UNITED KINGDOMRead more
All reviews

Equipment for Composite, Resin & Polymer Processing

See all 38 MELTING TANKS & HEATING EQUIPMENT products

  • Performance GuaranteeWaxMelters guarantees the best performance and the highest-quality construction.
  • Fast Lead TimesMost PRIMO tank sizes, AutoShot, EZ-1 and transfer systems usually ship within 3 to 5 days.
  • Fast, Efficient MeltingPRIMO melting tanks deliver 2-3x faster melting using half the electricity.
  • Built in Ronkonkoma, NYDesigned, built, tested and supported by the factory team since 1999.
  • BBB A+ RatedBetter Business Bureau A+ rating. View our BBB profile.

The Challenge

What Composites, Resins and Polymers Production Demands

Resins and polymers must stay inside their processing window, with controlled thermal history and a way to move viscous material to the line.

The WaxMelters Solution

Waterless PRIMO Heating, Sized to the Batch

PRIMO USA stainless steel tanks are the world's fastest, even-heating, most energy efficient melting tanks: 2-3x faster melting using half the electricity, with digital temperature control and no water jacket to maintain. Add Thermal Conditioning for a stable hold, EZ-T heated transfer to feed the line, and heated filling where product goes into containers.

Newsletter

Composites, Resins and Polymers Production Tips and Industry Updates

Sizing advice, melt-rate tips and new equipment notes for production teams. Once or twice a month.

No spam. Unsubscribe anytime. We never sell or share your email. Privacy Policy

Lead Times

Ship Times and Starting Prices

PRIMO ship times and starting prices by size
Size RangeCapacityStarting PriceLead TimeOrder
Small25 to 250 lbFrom $1,395Usually ships within 3 to 5 daysBuy Now
Medium350 to 1000 lbFrom $3,495Usually ships within 7 daysBuy Now
Large1500 to 7500 lbFrom $9,750Usually ships within 7 daysBuy Now
Extra Large10000 to 60000 lbFrom $38,500Usually ships within 7 daysRequest a Quote

Frequently Asked Questions

What equipment do Composites, Resins and Polymers manufacturers use?

Most start with a PRIMO stainless steel melting tank sized to the largest batch, add Thermal Conditioning when the material needs a stable hold, and add EZ-T heated transfer or heated filling to feed the line.

How fast does the equipment ship?

Most PRIMO tank sizes, EZ-1, AutoShot and transfer systems usually ship within 3 to 5 days. PRIMO 350 to 1000 usually ship within 7 days, and QUATTRO and OCTO usually ship within 7 to 21 days.

Can I get an application review before I buy?

Yes. Send your material, batch size, operating temperature and voltage, and the factory team will confirm sizing, options and freight with a formal quote. A mutual NDA is available.

Proof

Trusted by Manufacturers Since 1999

  • 1999Building Equipment Since
  • 40+Industries Served
  • A+BBB Rating
  • 3 to 5 DaysShip Time on Most PRIMO Sizes

“NASA/MSFC has the requirement for a Wax Melter, Pump and Transfer System with custom upgrades and has accepted WaxMelters equipment based on technical acceptability, schedule and price.”

Steven S., NASA Marshall Space Flight Center

“These pieces of equipment are critical to our current project. We are now buying an additional PRIMO wax melter and dispensing system.”

Jessica C., NASA Marshall Space Flight Center

“Our production is at least doubled. The equipment is easy to set up, extremely easy to use, and has worked great.”

Tyson, Candle Warmers Etc.
  • NASA
  • US Army
  • Lockheed Martin
  • Honeywell
  • Siemens
  • P&G
  • Unilever
  • S.C. Johnson
  • Kroger
  • Dow
  • Sonoco
  • Alene Candles
  • Yankee Candle
  • Voluspa
  • Lush
  • Scentsy

Get a Quote for Your Composites, Resins and Polymers Process

Send your material, batch size and voltage. The factory team confirms sizing, options and freight.

Thermal-processing systems for resins, polymers, elastomers, wax-polymer blends, composite materials, specialty compounds and other high-viscosity or process-sensitive engineered materials.

What the Equipment Must Do

Select the tank and downstream equipment around the material, operating temperature, working volume, hold time and production cadence, not the industry name alone.

Processing Window

Maintain temperature and viscosity within the material's usable range.

Thermal History

Control heating and hold conditions to reduce unnecessary exposure.

High-Viscosity Transfer

Coordinate vessel, valve, pump and hose selection around flow resistance.

Batch Demand

Match recovery capability to production cadence and downstream consumption.

Which PRIMO System Fits This Process?

Recommended starting point: PRIMO Thermal Conditioning. For many resin, polymer and composite workflows, PRIMO Thermal Conditioning is the preferred starting point because maintaining a stable processing window and viscosity is critical. Standard PRIMO is appropriate for compatible solid feedstocks or wax-polymer materials that primarily need melting. Rapid-Cycle fits compatible repeated-batch processes where recovery speed is a defined throughput constraint.
Melting & Production Holding

Standard PRIMO

Choose for compatible solid feedstocks, wax-polymer blends and materials whose primary requirement is melting.

View Standard PRIMO Melters →
RECOMMENDED STARTING POINT
Controlled Heating & Extended Holding

PRIMO Thermal Conditioning

Primary choice for resins and process-sensitive materials that must remain within a stable viscosity and temperature window.

View Thermal Conditioning Systems →
Recovery Speed & Production Throughput

PRIMO Rapid-Cycle

Choose when compatible materials are loaded repeatedly and recovery between batches limits production output.

View Rapid-Cycle Melters →

Continuous Coating & Impregnation for Flexible Reinforcements

For roll-fed or continuously guided substrates: WaxMelters builds custom heated immersion and roll-to-roll systems for fabric, fiber, yarn, cord, nonwovens, tapes, and other compatible flexible reinforcements. Systems can be configured around reviewed waxes, resins, polymers, and specialty compounds, with options for controlled immersion, circulation, wiping or squeeze rollers, cooling or setting distance, and manual or powered take-up.
View Continuous Coating & Impregnation Systems

Choosing a PRIMO Process Tank?

See how PRIMO waterless thermal processing works, including permanent heating systems, connected power, actual energy use, footprint, maintenance and long-term process fit.

Typical Thermal-Process Workflow

  1. 01

    Melt or condition the material.

  2. 02

    Maintain the validated processing window during hold.

  3. 03

    Use heated transfer and dispensing sized for viscosity and downstream demand.

Related Equipment & Process Guides

Have WaxMelters Review the Application

Send the material, starting and target temperatures, working volume, hold time, batch frequency, downstream process and available electrical service. For regulated or sanitary processes, also include required surface finish, fittings, cleaning method and facility standards.

Request an Application Review Calculate PRIMO Savings Explore PRIMO Systems