Trusted by
Reviews
- ★★★★★
We purchased our PRIMO Melter and EZ system from Melting & Filling Equipment for our ointment and...
Rowena, Herbs From Wales, UNITED KINGDOMRead more - ★★★★★
We love the PRIMO 1000 & PRIMO 2000 we ordered. They are definitely speeding up our wax melt...
Tyson K., Candle Warmers Etc.Read more - ★★★★★
I just wanted to take a moment to thank all of you- you are truly a pleasure to do business with....
Shannon D., Pure Light Candle CompanyRead more - ★★★★★
We were so pleased with our melting tank that we ordered another melter the same exact day. It...
Jim, J.C. Danczak, Inc., Westfield, MassachusettsRead more NASA/MSFC has the requirement for a Wax Melter, Pump and Transfer System with custom upgrades and...
Steven S., NASA, Marshall Space Flight CenterRead moreI just wanted to write and tell you about our company's experience with Wax Melters. We are in...
Terry H., Interior Provincial Exhibition & Stampede, CANADARead moreWe are in Armstrong British Columbia. Not only did she call to make sure that the wax melter had...
Terry H., Interior Provincial Exhibition, B.C., CANADARead moreWhat used to take me hours, now takes me minutes! Love it!! I will recommend your company to other...
Sonja Minic, Managing Director & Candle Artisan, Green Scents Pure Soy Candles, AustraliaRead moreIt takes us 15 minutes to do what used to take us 45 minutes. AND, that was just the first day.
Thomas Crane, Purely Wax Werks, Vancouver, WashingtonRead moreWithout the AutoShot system in our facility we would have had extreme backorders and labor costs...
Kevin Preece, COO, Scentsy, Meridian, IdahoRead moreI kissed my melter....Thank you!!!!!!!! I sincerely do not know how I did without one! What took me...
Jenny W., HB Wax Manufacturing Inc., Ontario, CANADARead moreI want to Thank You for all your support with the purchase of the Wax Hands Machine. I received it...
Hazel A., Condominio Miramar, El SalvadorRead more
Operating & Cleaning PRIMO Wax Hands Equipment
Build repeatable startup, operating, chamber-management, EZ-Clean Topper, shutdown and cleaning routines around the exact PRIMO configuration.
Operate the Equipment the Same Way Every Time
Consistency is the goal. Build a written startup, operating, cleaning and shutdown routine around the exact PRIMO model, wax and venue.
Pre-Startup Check
- Confirm the equipment is on a stable operating surface or the casters are positioned/locked as designed.
- Confirm the selected electrical service matches the equipment configuration.
- Inspect cords, controls, lids, removable chambers and any cooling section for obvious damage or contamination.
- Confirm the correct wax is assigned to each chamber.
- Install the EZ-Clean Topper correctly on multi-chamber systems.
- Confirm the cooling station and guest area are ready before opening the attraction.
Temperature Controls
Use the controller instructions supplied for the current control system. Do not assume that a setting used on a different wax, different controller generation or different machine is automatically appropriate.
WaxMelters' current troubleshooting guidance includes a maximum Wax Hands operating temperature. Follow the current manual and selected wax supplier guidance.
Removable Chambers
WaxMelters calls the individual vessels removable wax chambers. Remove or handle them only according to the equipment instructions and only when conditions allow safe handling. Their value is operational: individual colors can be managed, cleaned and serviced without treating the entire outer machine as one monolithic vat.
PRIMO EZ-Clean Topper
On new multi-chamber PRIMO systems, the EZ-Clean Topper is standard. Its purpose is not guest protection; it is wax management and professional presentation.
Color Separation
Helps direct drips back toward the intended chamber.
Keep Wax Out of the Gaps
Covers the spaces around removable chambers so dripped wax is less likely to enter areas that are difficult to clean.
Movement
Helps contain residual wax around chamber openings when equipment is repositioned or transported under the approved procedure.
Appearance
Creates a clean stainless-steel finished work surface.
Color Changes
Plan color changes. Use labeled chambers and tools, avoid introducing unknown wax into a chamber and allow enough time for the new material to reach the established operating condition.
Shutdown
Follow the model-specific shutdown procedure. Account for residual heat, lids, chamber condition, cooling-station water, electrical disconnection and transport. On X-Press, compact the system only according to its intended transport procedure and after the wax/equipment condition is appropriate for movement.
Cleaning
Cleaning is easiest when it is treated as part of every operating day. Remove the EZ-Clean Topper according to the equipment procedure, clean the accessible finished surface and maintain the removable chambers by color assignment.
Do not use an aggressive cleaning method, chemical or washdown procedure that conflicts with the selected machine's electrical/washdown configuration.
Worksheet: Daily Equipment Checklist
Continue the Guide
Return to the complete PRIMO Wax Hands Business & Operator Guide →
Published by Melting and Filling Equipment, Inc. / WaxMelters. © 2026. All rights reserved. Educational material only; follow current equipment-specific instructions, wax supplier guidance and applicable local requirements.
