★ BBB A+ Rated ★Online since 1999Serving 40+ Industries(888) WAX-MELTERS | (888) 929-6358Pay an InvoiceEN ES
WaxMelters logoWAXMELTERSThermal Process Equipment 0Cart
Buy NowCart 0Checkout
Home / Shop by Industry / Oil, Gas & Drilling Materials Processing

Industry Solutions

Oil, Gas and Drilling Equipment

Waterless PRIMO USA stainless steel melting tanks, heated transfer and heated filling for Oil, Gas and Drilling production. Built in the USA, BBB A+ rated, with direct factory support.

  • BBB A+ rated
  • Built in Ronkonkoma, NY
  • 1-year electrical, 3-year metal parts warranty
  • Trusted by NASA and Fortune 500s

Typical Starting Point

  • Melt: PRIMO from $1,395, usually ships within 3 to 5 days (25 to 250 lb)
  • Hold: Thermal Conditioning from $1,645
  • Move: EZ-T heated transfer from $2,995

PRIMO tanks usually ship within 3 to 5 days.

See It in Action

Real WaxMelters equipment in production: tap to play

Trusted by

NASA logoFender logoBlue Origin logoYamaha logoJim Beam logoMaker's Mark logo3M logoDuPont logoLockheed Martin logoGeneral Electric logoHoneywell logoSiemens logo

Reviews

  • ★★★★★We purchased our PRIMO Melter and EZ system from Melting & Filling Equipment for our ointment and... Rowena, Herbs From Wales, UNITED KINGDOMRead more
All reviews

Equipment for Oil, Gas & Drilling Materials Processing

See all 39 MELTING TANKS & HEATING EQUIPMENT products

  • Performance GuaranteeWaxMelters guarantees the best performance and the highest-quality construction.
  • Fast Lead TimesMost PRIMO tank sizes, AutoShot, EZ-1 and transfer systems usually ship within 3 to 5 days.
  • Fast, Efficient MeltingPRIMO melting tanks deliver 2-3x faster melting using half the electricity.
  • Built in Ronkonkoma, NYDesigned, built, tested and supported by the factory team since 1999.
  • BBB A+ RatedBetter Business Bureau A+ rating. View our BBB profile.

The Challenge

What Oil, Gas and Drilling Production Demands

Solid, semisolid and drummed materials must be melted and discharged with valves, pumps and hoses sized for the material at operating temperature.

The WaxMelters Solution

Waterless PRIMO Heating, Sized to the Batch

PRIMO USA stainless steel tanks are the world's fastest, even-heating, most energy efficient melting tanks: 2-3x faster melting using half the electricity, with digital temperature control and no water jacket to maintain. Add Thermal Conditioning for a stable hold, EZ-T heated transfer to feed the line, and heated filling where product goes into containers.

Newsletter

Oil, Gas and Drilling Production Tips and Industry Updates

Sizing advice, melt-rate tips and new equipment notes for production teams. Once or twice a month.

No spam. Unsubscribe anytime. We never sell or share your email. Privacy Policy

Lead Times

Ship Times and Starting Prices

PRIMO ship times and starting prices by size
Size RangeCapacityStarting PriceLead TimeOrder
Small25 to 250 lbFrom $1,395Usually ships within 3 to 5 daysBuy Now
Medium350 to 1000 lbFrom $3,495Usually ships within 3 to 5 daysBuy Now
Large1500 to 7500 lbFrom $9,750Usually ships within 3 to 5 daysBuy Now
Extra Large10000 to 60000 lbFrom $38,500Usually ships within 3 to 5 daysRequest a Quote

Frequently Asked Questions

What equipment do Oil, Gas and Drilling manufacturers use?

Most start with a PRIMO stainless steel melting tank sized to the largest batch, add Thermal Conditioning when the material needs a stable hold, and add EZ-T heated transfer or heated filling to feed the line.

How fast does the equipment ship?

PRIMO tanks, EZ-1, AutoShot and transfer systems usually ship within 3 to 5 days, and QUATTRO and OCTO usually ship within 3 to 5 days.

Can I get an application review before I buy?

Yes. Send your material, batch size, operating temperature and voltage, and the factory team will confirm sizing, options and freight with a formal quote. A mutual NDA is available.

Proof

Trusted by Manufacturers Since 1999

  • 1999Building Equipment Since
  • 40+Industries Served
  • A+BBB Rating
  • 3 to 5 DaysShip Time on Most PRIMO Sizes

“NASA/MSFC has the requirement for a Wax Melter, Pump and Transfer System with custom upgrades and has accepted WaxMelters equipment based on technical acceptability, schedule and price.”

Steven S., NASA Marshall Space Flight Center

“These pieces of equipment are critical to our current project. We are now buying an additional PRIMO wax melter and dispensing system.”

Jessica C., NASA Marshall Space Flight Center

“Our production is at least doubled. The equipment is easy to set up, extremely easy to use, and has worked great.”

Tyson, Candle Warmers Etc.
  • NASA
  • US Army
  • Lockheed Martin
  • Honeywell
  • Siemens
  • P&G
  • Unilever
  • S.C. Johnson
  • Kroger
  • Dow
  • Sonoco
  • Alene Candles
  • Yankee Candle
  • Voluspa
  • Lush
  • Scentsy

Get a Quote for Your Oil, Gas and Drilling Process

Send your material, batch size and voltage. The factory team confirms sizing, options and freight.

Which PRIMO System Fits This Process?

Recommended starting point: Standard PRIMO. For oil, gas and drilling materials, Standard PRIMO is usually the first system to evaluate when compatible waxes, paraffin-based compounds or solid feedstocks primarily need melting. PRIMO Thermal Conditioning is preferable when the material must remain at stable viscosity for extended holding or transfer. Rapid-Cycle fits repeated batch loading where faster recovery directly improves throughput.
RECOMMENDED STARTING POINT
Melting & Production Holding

Standard PRIMO

Primary choice for compatible waxes, paraffin-based drilling compounds and solid feedstocks requiring melting and batch heating.

View Standard PRIMO Melters →
Controlled Heating & Extended Holding

PRIMO Thermal Conditioning

Choose when extended heated holding, viscosity control or stable line supply is more important than maximum melt speed.

View Thermal Conditioning Systems →
Recovery Speed & Production Throughput

PRIMO Rapid-Cycle

Choose when repeated additions or batches cause unacceptable temperature recovery delays.

View Rapid-Cycle Melters →

Typical Thermal-Process Workflow

  1. 01

    Identify feedstock form, target temperature and viscosity.

  2. 02

    Select the PRIMO family around melting, holding or recovery.

  3. 03

    Configure discharge, transfer, filtration or mixing for the actual process.

Related Equipment & Process Guides

Melting & Batch Heating Heated Transfer Separation & Recovery Explore PRIMO Families

Have WaxMelters Review the Application

Send the material, starting and target temperatures, working volume, hold time, batch frequency, downstream process and available electrical service. For regulated or sanitary processes, also include required surface finish, fittings, cleaning method and facility standards.

Request an Application Review Calculate PRIMO Savings Explore PRIMO Systems

Melt · hold · oil & gas

Oil, Gas & Drilling: Process Energy Buyers Feel

Scroll like Wax Hands gallery: paraffin cakes, coating beads, wax bead, drilling sticks, sheets, gel pellets that match melt/hold/process on WaxMelters gear.

Oil and gas paraffin cakes staged for melt and hold
Paraffin cakes
Oil and gas coating beads staged for drilling materials work
Coating beads
Oil and gas wax bead staged for melt and hold
Wax bead
Oil and gas drilling sticks staged for compound work
Drilling sticks
Oil and gas wax sheets staged for process work
Wax sheets
Oil and gas gel pellets staged for melt and hold
Gel pellets

Illustrative product/materials lifestyle imagery for oil, gas and drilling vibe. Not a claim about specific equipment in the photos.

Heated melt / hold / process

From Paraffin Cakes to Beads, Sticks, Sheets & Gel

Keep paraffin cakes, coating beads, wax beads, drilling sticks, sheets and gel pellets at process temperature so materials stay clean: same production energy as the product cards above.

Paraffin cakes

Melt, hold and process: the process energy buyers associate with oil, gas and drilling materials manufacturing.

Coating beads

Keep paraffin, coating beads, drilling sticks and gels at process temperature so fills stay clean and consistent.

Wax bead

Uniform heat for oilfield melts before coating, stick or sheet work.

Drilling sticks

The production energy buyers feel when melt, hold and process stay controlled for oil, gas and drilling work.

Illustrative product/materials lifestyle imagery. Equipment models and options listed on the product cards above.

Melting and filling by industry

Buy Path for Industry Melting and Filling

WaxMelters is the industry leader and the leading USA manufacturer of melting, heating and filling equipment since 1999. Buy the heated path sized to your industry process: waterless PRIMO melting tanks (from $1,395), heated holding, heated fillers and dip systems for investment casting, aerospace, packaging, coatings, food and dairy, adhesives, candle, soap, beeswax and honey, and chocolate (thermal conditioning tanks). Built in Ronkonkoma, NY. Standard PRIMO sizes usually ship within 3 to 5 days. WaxMelters guarantees the best performance and the highest-quality construction. We are proud to hold an A+ rating with the Better Business Bureau.

Short answer: For oil, gas and drilling materials, WaxMelters, the industry leader and the leading USA manufacturer of melting, heating and filling equipment since 1999, builds heated tanks for specialty melts and viscous process materials that must stay fluid. WaxMelters guarantees the best performance and the highest-quality construction. We are proud to hold an A+ rating with the Better Business Bureau.

01

Heated Melt

PRIMO and jacketed tanks for your material.

02

Heated Fill

Dispense and transfer without cold-line choke.

03

One Factory

Melt, hold and fill from Ronkonkoma, NY.

04

Real Sizing

We size around viscosity at operating temperature.

Viscosity at operating temperature

What Viscosity Means for Your Industry Process

Every industry page still sizes around viscosity at operating temperature: not the industry name alone. Heat keeps material moving through tanks, hoses and heads.

01

What It Is

How thick your material is at the temperature you melt, hold or fill.

02

Why Heat Matters

Heat lowers viscosity so product transfers and fills without setting.

03

What We Size

PRIMO, jacketed, dip or fill equipment around your real process window.

Process Condition: temperature and viscosity at the work pointOne USA factory for melt, hold, dip and fill

Next Step

Tell us your industry, material, temperature and fill rate. We will shortlist the right equipment.