★ BBB A+ Rated ★Online since 1999Serving 40+ Industries(888) WAX-MELTERS | (888) 929-6358Pay an InvoiceEN ES
WaxMelters logoWAXMELTERSThermal Process Equipment 0Cart
Buy NowCart 0Checkout
Home / Shop by Industry / Oil, Gas & Drilling Materials Processing

Industry Solutions

Oil, Gas and Drilling Equipment

Waterless PRIMO USA stainless steel melting tanks, heated transfer and heated filling for Oil, Gas and Drilling production. Built in the USA, BBB A+ rated, with direct factory support.

  • BBB A+ rated
  • Built in Ronkonkoma, NY
  • 1-year electrical, 3-year metal parts warranty
  • Trusted by NASA and Fortune 500s

Typical Starting Point

  • Melt: PRIMO from $1,395, usually ships within 3 to 5 days (25 to 250 lb)
  • Hold: Thermal Conditioning from $1,645
  • Move: EZ-T heated transfer from $2,995

Heating options usually ship within 7 days.

Trusted by

Blue Origin logoNASA logoFender logoYamaha logoJim Beam logoMaker's Mark logo3M logoDuPont logoLockheed Martin logoGeneral Electric logoHoneywell logoSiemens logo

Reviews

  • ★★★★★We purchased our PRIMO Melter and EZ system from Melting & Filling Equipment for our ointment and... Rowena, Herbs From Wales, UNITED KINGDOMRead more
All reviews

Equipment for Oil, Gas & Drilling Materials Processing

See all 38 MELTING TANKS & HEATING EQUIPMENT products

  • Performance GuaranteeWaxMelters guarantees the best performance and the highest-quality construction.
  • Fast Lead TimesMost PRIMO tank sizes, AutoShot, EZ-1 and transfer systems usually ship within 3 to 5 days.
  • Fast, Efficient MeltingPRIMO melting tanks deliver 2-3x faster melting using half the electricity.
  • Built in Ronkonkoma, NYDesigned, built, tested and supported by the factory team since 1999.
  • BBB A+ RatedBetter Business Bureau A+ rating. View our BBB profile.

The Challenge

What Oil, Gas and Drilling Production Demands

Solid, semisolid and drummed materials must be melted and discharged with valves, pumps and hoses sized for the material at operating temperature.

The WaxMelters Solution

Waterless PRIMO Heating, Sized to the Batch

PRIMO USA stainless steel tanks are the world's fastest, even-heating, most energy efficient melting tanks: 2-3x faster melting using half the electricity, with digital temperature control and no water jacket to maintain. Add Thermal Conditioning for a stable hold, EZ-T heated transfer to feed the line, and heated filling where product goes into containers.

Newsletter

Oil, Gas and Drilling Production Tips and Industry Updates

Sizing advice, melt-rate tips and new equipment notes for production teams. Once or twice a month.

No spam. Unsubscribe anytime. We never sell or share your email. Privacy Policy

Lead Times

Ship Times and Starting Prices

PRIMO ship times and starting prices by size
Size RangeCapacityStarting PriceLead TimeOrder
Small25 to 250 lbFrom $1,395Usually ships within 3 to 5 daysBuy Now
Medium350 to 1000 lbFrom $3,495Usually ships within 7 daysBuy Now
Large1500 to 7500 lbFrom $9,750Usually ships within 7 daysBuy Now
Extra Large10000 to 60000 lbFrom $38,500Usually ships within 7 daysRequest a Quote

Frequently Asked Questions

What equipment do Oil, Gas and Drilling manufacturers use?

Most start with a PRIMO stainless steel melting tank sized to the largest batch, add Thermal Conditioning when the material needs a stable hold, and add EZ-T heated transfer or heated filling to feed the line.

How fast does the equipment ship?

Most PRIMO tank sizes, EZ-1, AutoShot and transfer systems usually ship within 3 to 5 days. PRIMO 350 to 1000 usually ship within 7 days, and QUATTRO and OCTO usually ship within 7 to 21 days.

Can I get an application review before I buy?

Yes. Send your material, batch size, operating temperature and voltage, and the factory team will confirm sizing, options and freight with a formal quote. A mutual NDA is available.

Proof

Trusted by Manufacturers Since 1999

  • 1999Building Equipment Since
  • 40+Industries Served
  • A+BBB Rating
  • 3 to 5 DaysShip Time on Most PRIMO Sizes

“NASA/MSFC has the requirement for a Wax Melter, Pump and Transfer System with custom upgrades and has accepted WaxMelters equipment based on technical acceptability, schedule and price.”

Steven S., NASA Marshall Space Flight Center

“These pieces of equipment are critical to our current project. We are now buying an additional PRIMO wax melter and dispensing system.”

Jessica C., NASA Marshall Space Flight Center

“Our production is at least doubled. The equipment is easy to set up, extremely easy to use, and has worked great.”

Tyson, Candle Warmers Etc.
  • NASA
  • US Army
  • Lockheed Martin
  • Honeywell
  • Siemens
  • P&G
  • Unilever
  • S.C. Johnson
  • Kroger
  • Dow
  • Sonoco
  • Alene Candles
  • Yankee Candle
  • Voluspa
  • Lush
  • Scentsy

Get a Quote for Your Oil, Gas and Drilling Process

Send your material, batch size and voltage. The factory team confirms sizing, options and freight.

Industrial melting, conditioning, heated holding and transfer systems for compatible drilling compounds, waxes, paraffin-based materials, lubricating compounds, sealants, additives and other temperature-dependent oilfield or industrial materials.

What the Equipment Must Do

Select the tank and downstream equipment around the material, operating temperature, working volume, hold time and production cadence, not the industry name alone.

Feedstock Form

Determine whether the material enters as a solid, semisolid, drum, block or pumpable liquid.

Viscosity and Discharge

Size valves, pumps and hoses around the material at operating temperature.

Holding Duration

Choose between melting-focused and conditioning-focused heating based on residence time.

Recovery Demand

Use rapid recovery when frequent additions or repeated batches are limiting production.

Which PRIMO System Fits This Process?

Recommended starting point: Standard PRIMO. For oil, gas and drilling materials, Standard PRIMO is usually the first system to evaluate when compatible waxes, paraffin-based compounds or solid feedstocks primarily need melting. PRIMO Thermal Conditioning is preferable when the material must remain at stable viscosity for extended holding or transfer. Rapid-Cycle fits repeated batch loading where faster recovery directly improves throughput.
RECOMMENDED STARTING POINT
Melting & Production Holding

Standard PRIMO

Primary choice for compatible waxes, paraffin-based drilling compounds and solid feedstocks requiring melting and batch heating.

View Standard PRIMO Melters →
Controlled Heating & Extended Holding

PRIMO Thermal Conditioning

Choose when extended heated holding, viscosity control or stable line supply is more important than maximum melt speed.

View Thermal Conditioning Systems →
Recovery Speed & Production Throughput

PRIMO Rapid-Cycle

Choose when repeated additions or batches cause unacceptable temperature recovery delays.

View Rapid-Cycle Melters →

Typical Thermal-Process Workflow

  1. 01

    Identify feedstock form, target temperature and viscosity.

  2. 02

    Select the PRIMO family around melting, holding or recovery.

  3. 03

    Configure discharge, transfer, filtration or mixing for the actual process.

Related Equipment & Process Guides

Have WaxMelters Review the Application

Send the material, starting and target temperatures, working volume, hold time, batch frequency, downstream process and available electrical service. For regulated or sanitary processes, also include required surface finish, fittings, cleaning method and facility standards.

Request an Application Review Calculate PRIMO Savings Explore PRIMO Systems