Industrial Equipment Selection Resources

Equipment Guides & Production Planning

Use these free guides and calculators to diagnose production bottlenecks, define the process requirement, choose the appropriate PRIMO system, size equipment around real production demand and evaluate downstream filling, facility and utility requirements.

Diagnose Plan Choose Size Integrate Validate
Not Sure Where to Begin?

Start With the Process Before Choosing Equipment

These two resources should be the starting point for most new equipment projects.

Start Here • Find the Constraint

What Is Slowing Down Your Production?

Determine whether melting or recovery, manual material handling, filling, cleanup, floor space or existing equipment capacity is actually limiting production.

Take the Production Self-Assessment
Start Here • Define the Requirement

Plan the Complete Production Process

Define the material, batch size, throughput, thermal duty, downstream demand, facility requirements and future growth before selecting an equipment model.

Open Industrial Production Planning
Equipment Selection Path

Move From the Production Problem to the Equipment Decision

Each resource answers a different question in the selection process.

01 • DIAGNOSE

Find the Bottleneck

Determine whether capacity, recovery, handling, filling or facility constraints are limiting output.

Self-Assessment →
02 • PLAN

Define the Process

Build the requirement around material, throughput, temperature, downstream demand and growth.

Production Planning →
03 • CHOOSE

Select the Thermal Family

Compare Standard PRIMO, Thermal Conditioning and Rapid-Cycle by what the process must do.

Compare PRIMO Systems →
04 • SIZE

Choose Capacity

Account for the current batch, usable reserve, batches per shift, downstream demand and future growth.

PRIMO Sizing Guide →
05 • INTEGRATE

Plan Filling & Transfer

Match the melter to pumping, heated transfer, dispensing, filling and downstream production.

Filling & Transfer Guide →
06 • VALIDATE

Evaluate the Facility

Compare equipment footprint, connected power, usable capacity and modeled facility requirements.

Footprint & Utility Calculator →
Then go deeper where the application requires it.

Use the technical guides below to compare waterless and water-jacketed heating, energy performance and other equipment-specific considerations.

Complete Equipment Planning Library

Use the Resource That Matches Your Next Decision

A production system should be evaluated as a complete process. Capacity, thermal duty, recovery, downstream equipment, facility requirements and future growth can all change the correct equipment choice.

01 • Diagnose & Define

Start With the Production Requirement

Production Bottlenecks

Production Efficiency Self-Assessment

Identify whether melting and recovery, manual handling, filling, cleanup, footprint or current equipment capacity is restricting output.

Find the Production Bottleneck →
Complete Process Planning

Industrial Production Planning

Define material behavior, batch size, throughput, thermal duty, downstream demand, facility requirements and expected growth.

Build the Production Requirement →
02 • Select & Size

Choose the Equipment Around the Process

Thermal Process Selection

Which PRIMO System Is Right for Your Process?

Compare Standard PRIMO for melting and production holding, Thermal Conditioning for controlled conditioning and longer holds, and Rapid-Cycle when recovery time is a major production constraint.

Compare PRIMO Systems →
Capacity Planning

PRIMO Sizing & Capacity Guide

Size around the largest expected batch, usable working reserve, batches per shift, production demand, filling requirements and anticipated growth.

Calculate the Appropriate PRIMO Size →
Budgetary Pricing

Melter & Tank Price Estimator

Enter your batch sizes or tank dimensions and the options you need. We size the PRIMO, round up to the next standard model and show you a ballpark price in about 3 minutes.

Get a Ballpark Price →
03 • Integrate & Validate

Plan What Happens Around the Tank

Downstream Production

Dispensing, Filling & Heated Transfer

Determine whether the downstream job requires measured filling, continuous heated transfer or both, then choose the appropriate automation level and equipment configuration.

Select a Filling or Transfer System →
Facility Planning

PRIMO Footprint & Utility Calculator

Compare equipment footprint, connected heating power, usable capacity, modeled heat-up energy and facility impact before finalizing the system.

Calculate Footprint & Utility Impact →
04 • Technical Comparison Guides

Go Deeper on Thermal Architecture & Energy Performance

Waterless vs. Water-Jacketed Heating

Compare the complete heat-transfer path, thermal mass, operator responsibilities and maintenance considerations rather than comparing temperature settings alone.

Compare Waterless & Water-Jacketed Systems →

Wax Melter Energy Efficiency Guide

Learn why heater wattage alone does not establish efficiency and how to compare measured kWh, process-ready time, usable capacity, recovery and complete production output.

Compare Energy & Thermal Performance →
Specialized Business & Operator Resource

PRIMO Wax Hands Business & Operator Guide

A separate public resource for operators evaluating a commercial wax-hand business, including equipment selection, consumables, event workflow, economics, marketing and technical support.

Open the Wax Hands Business Guide →
Equipment Planning FAQ

Common Equipment Selection Questions

Where should I start if I do not know what equipment I need?

Start with the Production Efficiency Self-Assessment if you are trying to identify the bottleneck. Then use Industrial Production Planning to define the material, thermal duty, throughput, downstream process and facility requirement before selecting equipment.

Should I choose a PRIMO system by tank size first?

No. First determine what the material and production process must do. Standard PRIMO, Thermal Conditioning and Rapid-Cycle are organized around different thermal priorities. Capacity should be selected after the process family and production requirement are understood.

Can I size a melter from batch capacity alone?

Batch size is an important first screen, but final capacity can also depend on usable reserve, practical headspace, batches per shift, recovery time, material density, filling or transfer demand and anticipated growth.

Why should filling and transfer be considered before final equipment selection?

Downstream equipment determines how quickly process-ready material leaves the tank. A faster filling or transfer system can increase required reserve and recovery capacity, so the melter and downstream equipment should be planned as one production system.

Is lower heater wattage automatically more energy efficient?

No. Wattage describes electrical power draw, while total energy use depends on power, operating time, heater cycling and heat loss. Compare equivalent production using actual or modeled kWh, process-ready time and usable output.

Application-Specific Equipment Review

Still Not Sure Which System Fits?

Send the material, physical state, batch weight or working gallons, starting and target temperatures, batches per shift, desired production rate, mixing or transfer requirements, available electrical service and expected future growth.

Request an Application Review