★ BBB A+ Rated ★Online since 1999Serving 40+ Industries(888) WAX-MELTERS | (888) 929-6358Pay an InvoiceEN ES
WaxMelters logoWAXMELTERSThermal Process Equipment 0Cart
Buy NowCart 0Checkout
Home / Shop by Industry / Industrial Maintenance & MRO Heating Systems

Industry Solutions

Industrial Maintenance and MRO Equipment

Waterless PRIMO USA stainless steel melting tanks, heated transfer and heated filling for Industrial Maintenance and MRO production. Built in the USA, BBB A+ rated, with direct factory support.

  • BBB A+ rated
  • Built in Ronkonkoma, NY
  • 1-year electrical, 3-year metal parts warranty
  • Trusted by NASA and Fortune 500s

Typical Starting Point

  • Melt: PRIMO from $1,395, usually ships within 3 to 5 days (25 to 250 lb)
  • Hold: Thermal Conditioning from $1,645
  • Move: EZ-T heated transfer from $2,995

Heating options usually ship within 7 days.

Trusted by

Blue Origin logoNASA logoFender logoYamaha logoJim Beam logoMaker's Mark logo3M logoDuPont logoLockheed Martin logoGeneral Electric logoHoneywell logoSiemens logo

Reviews

  • ★★★★★We purchased our PRIMO Melter and EZ system from Melting & Filling Equipment for our ointment and... Rowena, Herbs From Wales, UNITED KINGDOMRead more
All reviews

Equipment for Industrial Maintenance & MRO Heating Systems

See all 38 MELTING TANKS & HEATING EQUIPMENT products

  • Performance GuaranteeWaxMelters guarantees the best performance and the highest-quality construction.
  • Fast Lead TimesMost PRIMO tank sizes, AutoShot, EZ-1 and transfer systems usually ship within 3 to 5 days.
  • Fast, Efficient MeltingPRIMO melting tanks deliver 2-3x faster melting using half the electricity.
  • Built in Ronkonkoma, NYDesigned, built, tested and supported by the factory team since 1999.
  • BBB A+ RatedBetter Business Bureau A+ rating. View our BBB profile.

The Challenge

What Industrial Maintenance and MRO Production Demands

Sealants, coatings and maintenance compounds must keep flowing for pumping, spraying or application, in intermittent or continuous duty.

The WaxMelters Solution

Waterless PRIMO Heating, Sized to the Batch

PRIMO USA stainless steel tanks are the world's fastest, even-heating, most energy efficient melting tanks: 2-3x faster melting using half the electricity, with digital temperature control and no water jacket to maintain. Add Thermal Conditioning for a stable hold, EZ-T heated transfer to feed the line, and heated filling where product goes into containers.

Newsletter

Industrial Maintenance and MRO Production Tips and Industry Updates

Sizing advice, melt-rate tips and new equipment notes for production teams. Once or twice a month.

No spam. Unsubscribe anytime. We never sell or share your email. Privacy Policy

Lead Times

Ship Times and Starting Prices

PRIMO ship times and starting prices by size
Size RangeCapacityStarting PriceLead TimeOrder
Small25 to 250 lbFrom $1,395Usually ships within 3 to 5 daysBuy Now
Medium350 to 1000 lbFrom $3,495Usually ships within 7 daysBuy Now
Large1500 to 7500 lbFrom $9,750Usually ships within 7 daysBuy Now
Extra Large10000 to 60000 lbFrom $38,500Usually ships within 7 daysRequest a Quote

Frequently Asked Questions

What equipment do Industrial Maintenance and MRO manufacturers use?

Most start with a PRIMO stainless steel melting tank sized to the largest batch, add Thermal Conditioning when the material needs a stable hold, and add EZ-T heated transfer or heated filling to feed the line.

How fast does the equipment ship?

Most PRIMO tank sizes, EZ-1, AutoShot and transfer systems usually ship within 3 to 5 days. PRIMO 350 to 1000 usually ship within 7 days, and QUATTRO and OCTO usually ship within 7 to 21 days.

Can I get an application review before I buy?

Yes. Send your material, batch size, operating temperature and voltage, and the factory team will confirm sizing, options and freight with a formal quote. A mutual NDA is available.

Proof

Trusted by Manufacturers Since 1999

  • 1999Building Equipment Since
  • 40+Industries Served
  • A+BBB Rating
  • 3 to 5 DaysShip Time on Most PRIMO Sizes

“NASA/MSFC has the requirement for a Wax Melter, Pump and Transfer System with custom upgrades and has accepted WaxMelters equipment based on technical acceptability, schedule and price.”

Steven S., NASA Marshall Space Flight Center

“These pieces of equipment are critical to our current project. We are now buying an additional PRIMO wax melter and dispensing system.”

Jessica C., NASA Marshall Space Flight Center

“Our production is at least doubled. The equipment is easy to set up, extremely easy to use, and has worked great.”

Tyson, Candle Warmers Etc.
  • NASA
  • US Army
  • Lockheed Martin
  • Honeywell
  • Siemens
  • P&G
  • Unilever
  • S.C. Johnson
  • Kroger
  • Dow
  • Sonoco
  • Alene Candles
  • Yankee Candle
  • Voluspa
  • Lush
  • Scentsy

Get a Quote for Your Industrial Maintenance and MRO Process

Send your material, batch size and voltage. The factory team confirms sizing, options and freight.

Thermal-processing systems for greases, waxes, rustproofing compounds, corrosion-prevention coatings, oils, sealants, protective compounds and other maintenance materials.

What the Equipment Must Do

Select the tank and downstream equipment around the material, operating temperature, working volume, hold time and production cadence, not the industry name alone.

Material Flow

Maintain workable viscosity for pumping, spraying, coating or application.

Duty Cycle

Match heating and recovery to intermittent maintenance use or continuous production support.

Mobility and Transfer

Plan pumps, hoses and valves around the point of application.

Material Protection

Avoid overheating compounds that may degrade or change application behavior.

Which PRIMO System Fits This Process?

Recommended starting point: PRIMO Thermal Conditioning. For industrial maintenance and MRO materials, PRIMO Thermal Conditioning is usually the best starting point when greases, coatings or protective compounds need stable viscosity before application. Standard PRIMO is appropriate for waxes and compatible solids that mainly need melting. Rapid-Cycle fits repetitive coating or treatment operations where repeated loads create a recovery bottleneck.
Melting & Production Holding

Standard PRIMO

Choose for industrial waxes and compatible solid maintenance compounds that primarily need melting.

View Standard PRIMO Melters →
RECOMMENDED STARTING POINT
Controlled Heating & Extended Holding

PRIMO Thermal Conditioning

Primary choice for greases, corrosion-prevention coatings, oils and viscous materials needing stable heated holding.

View Thermal Conditioning Systems →
Recovery Speed & Production Throughput

PRIMO Rapid-Cycle

Choose for repeated batch or immersion-style maintenance operations where fast recovery improves cycle time.

View Rapid-Cycle Melters →

Typical Thermal-Process Workflow

  1. 01

    Bring the maintenance compound to working temperature.

  2. 02

    Maintain viscosity during staging and application.

  3. 03

    Use heated transfer and application components where cooling in the flow path would be a problem.

Related Equipment & Process Guides

Have WaxMelters Review the Application

Send the material, starting and target temperatures, working volume, hold time, batch frequency, downstream process and available electrical service. For regulated or sanitary processes, also include required surface finish, fittings, cleaning method and facility standards.

Request an Application Review Calculate PRIMO Savings Explore PRIMO Systems

Trusted By Manufacturers in Industrial Maintenance & MRO Heating Systems

WaxMelters supplies industrial thermal processing, melting, conditioning, heated transfer, dispensing, and filling equipment to companies, institutions, and production facilities across this market.

Companies we have supplied (15)
  • Department of Veterans Affairs
  • National Defence Canada
  • Department of Defence/Government of Canada
  • Thomas Scientific
  • Siemens
  • Honeywell
  • Dell
  • Kroger
  • Alcoa
  • GE
  • SC Johnson
  • DuPont
  • Sonoco
  • Autoglym
  • Bilt Hamber