★ BBB A+ Rated ★Online since 1999Serving 40+ Industries(888) WAX-MELTERS | (888) 929-6358Pay an InvoiceEN ES
WaxMelters logoWAXMELTERSThermal Process Equipment 0Cart
Buy NowCart 0Checkout

Trusted by

NASA logoFender logoBlue Origin logoYamaha logoJim Beam logoMaker's Mark logo3M logoDuPont logoLockheed Martin logoGeneral Electric logoHoneywell logoSiemens logo

See It in Action

Real WaxMelters equipment in production: tap to play

Reviews

  • ★★★★★We purchased our PRIMO Melter and EZ system from Melting & Filling Equipment for our ointment and... Rowena, Herbs From Wales, UNITED KINGDOMRead more
All reviews
Home / Textile, Fabric & Fiber Processing Equipment

Textile, Fabric & Fiber Processing Equipment

Equipment for Textile, Fabric & Fiber Processing Equipment

Shop all DIP TANKS, COATING & SLAB SYSTEMS

Equipment selection

Which PRIMO System Fits the Process?

The right starting point depends on whether the production constraint is the moving substrate, the coating bath, or recovery after new material is added.

Start with the complete material path. For roll-fed fabric, web, yarn, thread, or cord, begin with the Continuous Coating System and engineer the bath around it. For batch preparation or supply tanks, the choice between Standard, Thermal Conditioning, and Rapid-Cycle heating depends on material behavior, hold time, and required recovery, not industry name alone.

Standard PRIMO

For compatible waxes or solid feedstocks that melt predictably and do not require extended liquid-temperature conditioning.

Bath starting point

Thermal Conditioning

Often appropriate when stable bath temperature, viscosity, and extended production hold are central to coating consistency.

Rapid-Cycle

For operations where repeated cold additions or high throughput make recovery time the production bottleneck.

Common applications

Textile and Fiber Process Paths

Continuous Fabric & Web Coating

Roll-to-roll immersion of cloth, nonwovens, paper, compatible film, tape, and other flexible sheet materials.

Yarn, Thread & Cord Coating

Single- or multi-strand guidance through a controlled bath with winding selected for the required speed and tension.

Batch Material Preparation

Melting, conditioning, and holding compatible waxes or other reviewed coatings before application or transfer.

Circulation & Multi-Stage Processing

Pumps, filtration, reservoirs, return sections, multiple heated chambers, or downstream cooling can be integrated where the process requires them.

Typical workflow

From Coating Preparation to Finished Take-Up

Prepare

Melt or condition the coating at the verified operating temperature and viscosity.

Guide & Immerse

Control the substrate path, working width, strand spacing, bath contact, and residence time.

Control & Set

Wipe, squeeze, meter, cool, dry, or otherwise condition the coating after the bath.

Wind or Transfer

Collect the finished material with the appropriate manual or powered take-up arrangement.

Application data

Information Used to Engineer and Quote the System

Provide the following details so the bath, material path, frame, controls, and downstream equipment can be evaluated together.

RequirementWhat to provideWhy it matters
SubstrateMaterial, thickness, absorbency, flexibility, roll or strand format.Establishes guidance, roller surfaces, tension needs, and compatibility.
Working widthMaximum web width or strand count, diameter, and spacing.Sets bath length, roller face, frame width, and coating inventory.
CoatingProduct name, SDS, operating range, heated viscosity, maximum temperature, and cleaning method.Determines suitability, wetted materials, heat input, and safety review.
Required resultTarget pickup, thickness, penetration, finish, or acceptable range.Defines immersion, residence time, and coating-control hardware.
Production rateLine speed, immersion time, yards or pounds per shift, and replenishment pattern.Guides heater sizing, bath volume, recovery, and drive selection.
Roll handlingMaximum roll diameter and weight, core size, winding direction, and tension needs.Establishes shafts, brakes, motors, stands, and structural requirements.
Downstream processCooling or drying time, available distance, and desired condition before winding.Determines open run, fans, supports, or another process stage.
FacilityElectrical service, floor space, ventilation, washdown, and area classification.Sets controls, installation, guarding, sanitation, and site requirements.

Related equipment & guidance

Continue Planning the Process

Continuous Fabric, Yarn & Web Coating Dip Tanks, Coating & Slab Systems Dipping, Coating & Impregnation Guide Adhesives, Coatings & Specialty Chemicals Composite, Resin & Polymer Processing

Frequently Asked Questions

Textile, Fabric & Fiber Processing FAQs

What textile and fiber materials can the system process?

Potential substrates include fabric, cloth, nonwovens, yarn, thread, cord, paper, compatible film, tape, and other flexible webs or strands. Final suitability depends on dimensions, temperature exposure, coating compatibility, tension, and the required finished result.

Is a continuous coating system the same as a circulating dip tank?

No. In a continuous coating system, the substrate moves through the bath. In a circulating system, the coating material moves through a pump or loop. A continuous system can include circulation as a supporting feature.

Can WaxMelters equipment process materials other than wax?

Potentially. The coating's safety data, chemistry, heated viscosity, operating temperature, cleaning method, and facility classification must be reviewed. Solvent-based, reactive, combustible, or otherwise hazardous materials require specific engineering review and may not be suitable.

Can the system use manual or powered take-up?

Yes. Manual, geared, and variable-speed powered take-up arrangements can be evaluated. Unwind controls, braking, tension, roll weight, and future automation should be included in the application review.

What information is needed for a quote?

Provide the substrate and working width, coating and SDS, operating temperature and viscosity, desired coating result, line speed or immersion time, roll dimensions, cooling or drying distance, take-up method, electrical service, floor space, and facility classification.

Start with the application

Discuss Your Textile or Fiber Process

Send the substrate, coating, dimensions, temperatures, production target, material path, and available floor space. WaxMelters will review the application before recommending and pricing a system.

Request a QuoteCall (888) WAX-MELTERS | (888) 929-6358

Textile, fabric and fiber

Engineer the Heated Bath Around Width, Speed and Coating Behavior

Custom PRIMO heated systems prepare and apply waxes and temperature-controlled coatings to fabric, yarn, thread, cord, nonwovens, paper, film and flexible webs. Size the bath and material path around working width, strand count, coating behavior, line speed and cooling distance - not a catalog guess.

Short answer: For textile, fabric and fiber wax coating equipment, WaxMelters, the industry leader and the leading USA manufacturer of melting, heating and filling equipment since 1999, builds custom PRIMO heated baths and continuous coating systems around working width, line speed and coating viscosity. WaxMelters guarantees the best performance and the highest-quality construction. We are proud to hold an A+ rating with the Better Business Bureau.

Process priorities

What Textile and Fiber Equipment Must Control

01

Working Width

Bath and immersion path sized to substrate width or strand count.

02

Bath Temperature

Hold coating viscosity repeatable as cold product enters.

03

Line Speed

Recovery and immersion length must match throughput.

04

Take-Up Path

Manual or powered take-up after cool or set distance.

Viscosity at operating temperature

What Viscosity Means on This Page

Coating wax and finish viscosity at bath temperature decides coat weight and uniformity. Too cool thickens coats; unstable heat streaks the web.

01

What It Is

How thick the batch is at the temperature you actually melt, hold, transfer or fill, not room temperature on the bench.

02

Why Heat Matters

Heat lowers viscosity so product moves through a heated pump, hose and fill head without setting in the line.

03

What We Size

Tank family, pump, heated hose and head around viscosity at operating temperature, plus elevation and hose length.

Fill Condition: keep temperature and viscosity at the dispense pointHigh-viscosity pump options on EZ-1, AutoShot, Quattro and Octo

Technical shortlist

Equipment Notes From the Old Production Guides

01

Custom PRIMO Baths

Waterless heated immersion for compatible coatings.

02

Continuous Coating Systems

Immersion roller, cool/set distance and take-up as one path.

03

Stainless Wetted Surfaces

USA-built for production webs and strands.

04

Application Review

Width, material, temperature and speed before pricing.

Quick answers

FAQs

Is this a stock tank?

Most textile and fiber systems are application-configured around width and line speed.

What should I send for a quote?

Substrate, working width, coating material, temperature, line speed and take-up needs.

Next Step

Tell us substrate, working width, coating material, temperature and line speed.